Skip to content
    babybolts red Multi-Trade Prefabrication

    Controlled Production for Scale, Quality, & Speed

    By moving complex work upstream into controlled environments, we deliver products that speed up install, reduce jobsite risk, eliminate waste, and keep schedules moving. Every panel, assembly, and device is designed, built, and tested to fit your project's needs. And then packaged by space to be delivered as needed by our own semi transport fleet.

    Designed for Customization, Scale, and Fast Field Installation

    We apply an extreme level of focus on on process design, solution engineering, and strategic procurement; delivering unmatched prefab capabilities that provide our partners with the field customization they need, the risk reduction they deserve, and the speed they appreciate.

    Electrical Prefab

    3-Jan-20-2026-06-47-46-5035-PM               1-Jan-20-2026-06-47-46-4397-PM               2-Jan-20-2026-06-47-46-4288-PM

    Driving Consistency, Speed, and Quality

    Electrical systems are among the most complex scopes on a project. We prefabricate everything from conduit assemblies to complete electrical rooms. Each assembly is engineered, built, and sequenced for the field, ensuring a consistent, high-quality installation every time. Field teams save time, reduce congestion, and work in safer conditions — while project owners benefit from predictable outcomes. 

    Fire Alarm Prefab

    5-4              4-4              6-4 

    Standardized, Programmed, and Pre-tested—Ensuring Life Safety Reliability

    Fire alarm systems demand precision. Our prefab panels, built with standardized black gutters and red end caps, are fully programmed and tested before leaving The LINK. Field teams mount the assemblies, connect them, and move on — eliminating days of wire-by-wire installation and troubleshooting. The result? Cleaner installs, faster inspections, and life-safety systems ready exactly when they’re needed. 

    Lighting Controls Prefab

    7-1               8               9

    Simplification and Customization at Scale

    Lighting control systems are often messy and time-consuming in the field. Our yellow-coded tunnel boxes and vertical gutter assemblies fit perfectly between studs, avoiding drywall conflicts. Inside, labeled terminal blocks replace tangled wire bundles, and cables are pre-tested before shipment.
    Not only do we benefit our teams with faster, cleaner installs, but also our customers get organized, professional systems that are easier to service. Remote diagnostics eliminate delays and provide post-install access and adjustments.

    Low Voltage Prefab

    12               Prefab Website Images               10

    Plug-and-Play Performance
    CCTV, access control, AV, and automation are technically demanding systems. By programming, labeling, and testing devices in-house, we remove bottlenecks that typically slow installation. Devices arrive mapped, addressed, and verified, allowing field teams to deploy faster and handle more projects efficiently. This approach has been proven across project types while consistently delivering reliability and reducing field risk.

    babybolts red

    Prefabrication Advantages

    CLEANER Prefabricated assemblies arrive organized and ready to install—reducing clutter and improving jobsite conditions.
    FASTER Reduced field labor and rework accelerate schedules and keep projects moving.
    ASSURED Fully tested, field-ready systems eliminate surprises at installation.
    PREDICTABLE Consistent outcomes across electrical, low voltage, fire alarm, and lighting controls.
    TESTED Our COE team is dedicated to R&D, testing, and sourcing the best solutions for various applications.
    Case Studies, Prefab in Action

    Real Results, Real Projects

    Willets Point
    Willets Point
    Queens, New York

    Prefab Perfection in NYC

    Strong teamwork, cross-trade collaboration, and prefabbed assemblies made for seamless installations across Willets Point in New York. Hear from our Superintendents who coordinated with our teams at the LINK, to bring this prefab project to life. 

    1000 Virginia
    1000 Virginia
    Seattle, Washington

    Cross-Country Coordination

    From Palmetto, FL to Seattle, WA our prefab and logistics team successfully prefabbed assemblies, and delivered them cross-country with our own semi-fleet trucks to 1000 Virginia, to keep projects moving swiftly and efficiently. See the roadtrip success and learn more about our capabilities.

    Fleet Thumbnail
    Power Design's Fleet

    Just in Time Delivery, Every Time

    From the moment materials leave the SHOP to their arrival on site, our in-house transport fleet is built for reliability. Every delivery is packed, kitted, crated, and wrapped with intention—protecting quality and maintaining order from storage through set-down. With 24/7 fleet tracking and continuous quality oversight, our teams stay connected and informed, working closely with superintendents to ensure materials arrive exactly when and where they’re needed. By eliminating third-party detours and delays, we're delivering cleaner installs, tighter schedules, and confidence you can count on—finished with a handshake on arrival.

    babybolts red

    Prefab Your

    Project With Us

    Looking for a partner who's truly invested in your needs, delivering on quality and trust across your project?

    Let's Connect

    More About Our Services

    graphic