Skip to content
    July 11, 2025

    Prefab Perfection in NYC ðŸŒ‡

    In the heart of Queens, just steps away from Citi Field, we are bringing a transformative vision to life at Willets Point — an 860,000-square-foot affordable housing development that includes over 880 units across two buildings. Ready to see how we delivered and installed a fully prefabricated electrical room in New York? Take a look.

     

    Our success on this project was all about our electrical prefabrication and in-house distribution, which helped eliminate jobsite delays, reduce manpower requirements, and deliver a high-quality product with precision and speed. Our prefabrication and distribution center is located in Palmetto, Florida, where we collaborate with the project team on-site to assemble these panel boards accurately. As a result, when they arrive on-site, it’s as simple as plugging the equipment in.

     

    When we prefab our panels at the warehouse, there are a lot of downstream benefits. Yes, we can do it faster — but more importantly, we’re reducing material handling, minimizing safety risks, and ensuring QC checks at every stage. The work arrives on-site ready to go, which keeps the job moving. 

    Joe Guadagnino | Senior Operations Manager | Power Design

     

    Delivered by our very own fleet trucks, this major installation went off without a hitch – this was not only a major step for our prefab teams, but our field teams also. They worked together to coordinate timelines, schedules, and quality control processes, ensuring that things ran smoothly on site.

     

    Project Superintendent and New York native, Itzik Cohen, saw the impact of a seamless prefab installation firsthand.

     

     

    Prefab simplifies everything; it allows us to run a smaller, tighter crew, with less material clutter and less risk. Our prefab rooms arrive fully built to our specs. We put them up on the wall, connect our circuits, and we’re done. It saves time, money, and effort. 

    Itzik Cohen | Project Superintendent | Power Design

     

    Coordination between Power Design Resource’s logistics team, project management, and field leadership was key to making it work. From material deliveries and storage to preordination of the installs, the teamwork was unmatched.

     

    Willets Point is about to change the game for Queens – and not just about Mets Baseball at Citi Field. It marks the beginning of a larger community development initiative. With plans for affordable housing, assisted living, a school, a soccer stadium, and more, this project will redefine the neighborhood.

     

    I grew up here. This area’s been overlooked for decades. To be part of something that’s going to bring real value to the community — that’s powerful.

    Itzik Cohen | Project Superintendent | Power Design

     

     

    Power Design

    Our mission is to be the most trusted partner. With passion and accountability, we will deliver unmatched performance and a PlusONE experience. At Power Design we build more than just buildings - we build relationships that last.